Air Leakage Control Installer Exam Prep
Free practice questions

Free ALCI Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The ALCI exam has 40 questions and runs 7 hours.

Question 1

After peeling back the wrap on an attic supply duct, an installer finds a loose sheet-metal takeoff. A 3/8-inch gap remains even when the takeoff is held in its correct position. Neither metal piece is damaged, and the work order includes repairing this connection. Which repair is appropriate before the wrap is restored?

Show answer & explanation

Correct answer: B - Secure the takeoff with appropriate screws, then cover the gap with mesh and mastic.

Question 2

For a panel separating a test chamber from the room, an installer records: fan running; smoke stationary at the joint; manometer reading 0 Pa; both pressure-tube ends open to the room. Which interpretation is valid for the required 75-Pa smoke test?

Show answer & explanation

Correct answer: D - Pressure across the panel is unverified because both tubes are sampling the same space.

Question 3

The crew leader marks a plumbing chase for sealing. An installer exposes ceiling gypsum on three sides, but the fourth edge remains beneath a removable batt and a loose storage-floor board. The board is clear of utilities and hazardous materials. To prepare a durable seal, the installer needs to expose:

Show answer & explanation

Correct answer: A - The entire perimeter back to intact ceiling finish, including below the loose floorboard.

Question 4

Before dense-packing a floored attic, the crew tests the machine using a box with an internal volume of 1.5 ft³. The empty box weighs 4.8 lb; filled, it weighs 10.5 lb. The work order specifies a minimum density of 3.5 lb/ft³. Which interpretation and next step are correct?

Show answer & explanation

Correct answer: C - Density is 3.8 lb/ft³; retain the settings and smoke-check the first packed cavity at 75 Pa before filling the remainder.

Question 5

While a crew air-seals a gas-heated home, a carbon monoxide alarm sounds and two occupants report new headaches and nausea. No one smells smoke or fuel. What takes priority?

Show answer & explanation

Correct answer: A - Move everyone outdoors and call 911 from outside; do not reenter until emergency responders give clearance.

Question 6

The work order retains a serviceable non-IC recessed light and calls for a sealed enclosure. The proposed box has a 1/2-inch gypsum top, no insulation above it, and sides extending through the full insulation depth. Insulation would be 4 inches from the lamp can but only 1-1/2 inches from its attached wiring box. Select the needed revision.

Show answer & explanation

Correct answer: B - Move the enclosure side out to leave 4 inches between the insulation and the attached wiring box.

Question 7

A bathroom fan has a 4-inch round outlet. Two exterior wall termination locations are approved: one is 8 feet away with one broad turn; the other is 18 feet away with three turns. Both satisfy the project's weather-protection and separation requirements. Which installation best preserves exhaust performance?

Show answer & explanation

Correct answer: D - An 8-foot run of 4-inch insulated flex duct connected airtight to a full-sized hood at the nearer location.

Question 8

Loose-fill insulation is at the specified depth over an exterior wall top plate, but wind passes beneath the soffit chute and through the insulation. The chute already maintains a clear 1-inch channel below the roof deck. The roof ventilation path must remain in service. How should the wind-washing problem be corrected?

Show answer & explanation

Correct answer: C - Fit a wind block beneath the chute above the top plate; preserve the roof channel.

Question 9

An installer has fitted sheet-metal air stops around a propane-only vent and a wood-burning chimney. The available silicone RTV sealant is rated to 600°F and listed for gas-vent use, but has no approval for wood-chimney use. Which material decision is justified?

Show answer & explanation

Correct answer: C - Use it at the propane vent; select a suitable noncombustible sealant for the wood chimney.

Question 10

The next bypass is between exposed ceiling joists in an unfloored attic. The joists are sound and adequate for the worker, tools, and platform. A properly sized temporary work platform is available. Choose the appropriate access plan for the repair.

Show answer & explanation

Correct answer: A - Support and secure the platform on the joists, keeping body and equipment loads off the ceiling finish.

That's 10 of 1,030

The full bank has 1,020 more ALCI questions with explanations.

Continue in the free practice test →

View plans